上传图纸修订

目标

在 Procore 的项目图纸工具中上传对现有图纸的修订。

背景

如果你已经将图纸上传到 Procore 中的项目并需要上传修订,你将以与通常将图纸上传到图纸工具相同的方式上传它们。当你将图纸修订上传到项目时,Procore 会将图纸 编号识别为与已上传的图纸重复,并将其标记为现有图纸的修订。图纸修订将自动出现在现有图纸的修订历史记录下。

需要考虑的事项

  • 所需用户权限:
  • 其他信息:
    • 图纸必须以 PDF 文件格式上传。PDF 文件必须是 1.6 或更高版本。
    • 只要以下字段中有一项是唯一的,就可以上传修订编号或字母相同的图纸:图纸集名称、图纸日期或接收日期。请参阅我可以上传修订版本相同的图纸吗?
    • 添加到先前图纸修订的私密或个人和已发布图层的标记将在新图纸修订中保留和沿用。如果在上传了新修订后向旧修订添加标记,它们将不会添加到新修订中。
    • 草图在上传后不会转移到新修订。
    • 上传处理完成之后会发送通知电子邮件。请参阅谁会收到图纸工具中的更新通知?
    • 如果图纸上传失败,则可能是由于文件已加密、受密码保护或已损坏。请参阅为什么我的图纸上传失败?

视频

 

步骤

  1. Navigate to the project's Drawings tool.
  2. Click Upload.
  3. Click Attach Files.
    Tip
    For best results, format your drawings for OCR. See How can I improve the accuracy of OCR on my drawings? 
  4. Select the files to upload from your computer. 
  5. Once uploaded, click Attach.
  6. Click the Select or Create Set drop-down menu under Drawing Set.  
  7. Choose one of these options:
    Select a Drawing Set
    To add the drawing to an existing set: Start typing the set name. Procore shows any sets matching your entry and you can highlight the match to select it. 
    select-drawing-set.png

    Create a Drawing Set
    To add the drawing to a new set: Type a set name and click Create Set [Your Set Name].

    create-drawing-set.png
     
  8. Fill in these fields:
    • Set Date: The date the architect sent the drawing set. 
      • If adding to an existing set, Procore populates this field automatically. 
      • If creating a new set, click the field to select a date from the calendar.
    • Default Drawing Date: The date the drawings were authored. This appears as the 'Drawing Date' on all drawings in the set.
      • Click the field to select a date from the calendar. 
    • Default Received Date: The date a drawing was received or issued by the creator of the drawings (i.e. the design team).
      • Click the field to select a date from the calendar. 
    • Advanced Options: Click the arrow caret-icon.png icon next to Advanced Options to show the following options.

      upload-drawings-advanced-options.png
       
      • Default Revision: If your set has a default drawing revision number or letter, enter it here. The default revision will be set as the 'Revision' for all drawings in this upload.
        Note: If a default revision is not specified, Procore will use the drawing number to determine the revision. 
      • Drawing No. Contains Revision: Click the drop-down menu and select the option that applies to the drawings. If a drawing number contains a revision, the drawing number will be separated at the first decimal or underscore into the Drawing No. and the Revision. For example, a drawing with 'A203.01' would show 'A203' as the Drawing No., and '01' as the Revision. 
        Note: See 'Get From Filename' below for guidelines on filenames if you use both settings.
        • No Rev in Drawing Number: Select if the drawings do not include revisions in the drawing numbers.
        • Rev is After First Decimal: Select if the drawings contain revisions after the first decimal of a drawing number (example: A203.01). 
        • Rev is After First Underscore: Select if the drawings contain revisions after the first underscore of a drawing number (example: A203_01). 
        • Rev is After Last Underscore: Select if the drawings contain revisions after the last underscore of a drawing number (example: A203__EE__01)
      • Drawing Number: 
        • Get From Filename: Mark the checkbox if you want Procore to pull the number and title of an individual drawing based off of the filename. This will bypass OCR and result in higher accuracy in the naming of your drawings.
          Important! If you are using the 'Drawing No. Contains Revision' setting above, drawing filenames should match the following formats:
          • For 'No Rev in Drawing Number': Number_Title.pdf 
            Note: If there is no underscore between the drawing number and title, the entire filename will be entered for the drawing number.
          • For 'Rev is After First Decimal': Number.RevNumber_Title.pdf
          • For 'Rev is After First Underscore': Number_RevNumber_Title.pdf
          • For 'Rev is After Last Underscore': Number_Title_RevNumber.pdf
      • Drawing Language: Procore's OCR can scan for drawings in English, French, German, and Spanish. The language for your drawings is automatically selected based on the locale of the project or company, but you can select another language from the drop-down menu if necessary. See Can I change the language that Procore scans my drawings for?
  9. After the upload has been processed, you can Review and Confirm the Drawings.
    Note: A progress indicator is available in the 'Items to Review' pop up window.
    drawings-items-to-review-pop-up.png
     
 注意
  • 如果图纸编号相同,Procore 的 OCR 将自动识别图纸编号、标题和类别字段。
  • 如果该图纸与同一区域中的另一幅图纸编号相同,Procore 将自动填写其余信息,包括下一个修订编号(最新上传版本将使用修订编号)。

后续步骤

  1. 审核并确认图纸
  2. 发布图纸