目标
在本地软件中更新项目进度计划,并将进度计划更新上传到 Procore。
需要考虑的事项
- Required User Permissions:
- 'Admin' level permissions on the project's Schedule tool.
- Additional Information:
Important
If you are uploading an updated project schedule into Procore via the project level Schedule tool, make sure to use the same file name that was previously uploaded. This way the information in the Schedule Change Request History section will NOT be cleared. In addition, this will help ensure you do not have duplicate Lookahead Schedule Activities.
-
Supported File Formats:
The file types listed below can be uploaded directly:
- MPP (Microsoft Project)
- MPX (Microsoft Project, SureTrak)
- XER (Primavera P6, Primavera Contractor)
- PP (Asta Powerproject, Asta Easyplan)
- XML (Formatted for Microsoft Project, e.g. Smartsheet, OpenProject)
- XML (Primavera PMXML)
- PPX (Phoenix Project Manager)
- FTS (FastTrack Schedule)
- POD (ProjectLibre)
- GAN (GanttProject)
- PEP (TurboProject)
- PRX (Primavera P3)
- STX (Primavera SureTrak)
- CDPX (ConceptDraw PROJECT)
- CDPZ (ConceptDraw PROJECT)
- SP (Synchro Scheduler)
- ZIP (Compressed file containing one of the supported file types listed above)
PROCORE 支持:内部说明
如果使用Primavera P6的客户询问完成百分比:
P6有一个名为"完成百分比类型"的活动属性。这指定应报告三个完成百分比值(持续时间、物理和单位)中的哪一个。Procore 读取此设置并将指定的完成百分比类型返回给 Procore。
步骤
- 导航到项目的进度计划工具。
- 在甘特图视图中,点击 + 上传进度计划。
注意:系统会自动重定向到工具配置设置中的更新进度计划页面。
- 从计算机中选择一个进度计划文件。
- 点击添加文件链接并选择进度计划文件。
或者
- 将进度计划文件从计算机拖放到拖放文件区域。
- 导航到计算机或网络上的进度计划文件,然后点击打开。
- 滚动到页面底部,然后点击更新。
注意:
- 此时将出现“进度计划已上传,处理应尽快开始”的消息。进度计划放入作业队列,系统会逐个任务地更新进度计划。根据队列中的作业数量和项目进度计划的大小,覆盖过程可能需要一些时间才能完成。在此过程中,你可以继续在 Procore 中工作
- 重要提示!在更新进度计划时,建议不要尝试上传另一个进度计划更新。这样做会将第二个作业添加到队列中,并且作业将按照它们上传到系统的顺序进行处理。