Procore 的默认变更类型和变更原因是什么?

答案

当用户创建变更事件时,有"类型"和"原因"下拉列表,用户可在其中选择事件的变更 类型和原因。公司可以显示/隐藏默认选项,并创建要选择的自定义选项。有关说明,请参阅设置默认变更管理配置

Procore 的默认变更类型是什么?

以下是 Procore 的默认变更原因。公司可以显示/隐藏这些选项并向此列表添加自定义原因,因此你的列表可能包含不同的选项。

变更类型 定义
限额

An Allowance is an amount of money that has been set aside in a construction contract’s original sum to cover the costs of paying for known items that were not specified in detail in the contract. 

应急开支

A Contingency is an amount of money held in reserve to pay for accidental or additional unforeseen costs during a construction project.

业主变更

An Owner Change refers to an event initiated by a request from the construction project’s owner.

安全 安全是指任何主动的与安全相关的变更,这些变更可能会影响项目的进度、预算或工作范围。
待定 待定表示变更事件类型待定。
转让

A Transfer refers to a change in ownership for the performance of work. 

Procore 的默认变更原因是什么?

以下是 Procore 的默认变更原因。公司可以显示/隐藏这些选项并向此列表添加自定义原因,因此你的列表可能包含不同的选项。

变更原因 定义
限额

An Allowance is an amount of money that has been set aside in a construction contract’s original sum to cover the costs of paying for known items that were not specified in detail in the contract. 

扣款

A Backcharge is an amount of money that a buyer holds back from a seller to recover any costs incurred as a consequence of the seller performing incomplete or defective work. For example, an Owner might bill a backcharge to a General Contractor (GC) for site clean-up or a GC might bill a backcharge to a subcontractor for property damage. 

客户请求

A Client Request refers to a change in the performance of work initiated by a request from the construction project’s client.

扩初设计

Design-Development (DD) refers to one of the five (5) phases of architectural services of a construction project where the Architect uses the Schematic Design (SD) to produce the project's initial Construction Documents (CDs). 

现有条件

An Existing Condition refers to a change that occurs where design plans must be modified due to existing conditions at the job site.

空白 这是新创建的变更事件的"变更原因"字段的默认状态,并启用了变更事件 - 清空默认的"变更原因"功能。

 