A submittal refers to the written and/or physical information provided by a responsible contractor (i.e., contractors and subs) to the general contractor. This information is submitted to the design team for approval of equipment, materials, etc. before they are fabricated and delivered to the project. Submittals can be presented in various formats, such as shop drawings, cut sheets on equipment, and material samples. Submittals are required primarily for the architect and engineer to verify that the correct products and quantities will be installed on the project in compliance with the design documents/contract documents.
送审通常由项目经理和/或承包商(或分包商)创建,以向责任分包商索取有关计划在项目中制造和/或安装的特定项的信息。分包商提交信息(例如,材料数据、产品数据、产品示例、施工图等)后,项目和设计团队就会审核提交的信息,以确保信息符合项目图纸和规范的要求。获得批准后,送审将返回给分包商,这表明工程(或制造)已获准进行施工。
In Procore, an Approval Workflow designates the list of individuals who respond to submittals (for example, approve, reject, and so on.) in accordance with the rules that have been determined by the approval framework and approval process being used.