答案

A submittal refers to the written and/or physical information provided by a responsible contractor (i.e., contractors and subs) to the general contractor. This information is submitted to the design team for approval of equipment, materials, etc. before they are fabricated and delivered to the project. Submittals can be presented in various formats, such as shop drawings, cut sheets on equipment, and material samples. Submittals are required primarily for the architect and engineer to verify that the correct products and quantities will be installed on the project in compliance with the design documents/contract documents.

常见类型

  • 施工图、材料数据、产品示例或其他产品数据(例如,蓝图、产品手册等)

建设工程流程

  • 送审通常由项目经理和/或承包商(或分包商)创建,以向责任分包商索取有关计划在项目中制造和/或安装的特定项的信息。分包商提交信息(例如,材料数据、产品数据、产品示例、施工图等)后,项目和设计团队就会审核提交的信息,以确保信息符合项目图纸和规范的要求。获得批准后,送审将返回给分包商,这表明工程(或制造)已获准进行施工。

潜在审批工作流

In Procore, an Approval Workflow designates the list of individuals who respond to submittals (for example, approve, reject, and so on.) in accordance with the rules that have been determined by the approval framework and approval process being used. 

  • 分包商提交)> 总承包商审核)> 建筑师审核)> 总承包商分发)> 分包商接收和准备工程
  • 分包商提交)> 总承包商审核)> 工程师审核)> 建筑师审核)> 总承包商分发)> 分包商接收和准备工程
  • 分包商提交)> 总承包商审核)> 施工经理审核)> 工程师审核)> 建筑师审核)> 施工经理(审核)> 总承包商分发)> 分包商接收和准备工程
  • 分包商提交)> 总承包商审核)> 施工经理审核)> 工程师审核)> 建筑师审核)> 施工经理审核)> 业主代表审核)> 总承包商分发)> 分包商接收和准备工程
了解如何在 Procore 中管理你的送审:送审

 